Flowmaster Integration provides flexible, onboard simulation solution to reduce failure and maintenance costs

Babcock Marine is the UK’s premier naval support contractor. It owns and operates both Devonport and Rosyth Royal Dockyards and manages the Clyde Submarine Base at Faslane.  Babcock Marine is the sole support partner for the Royal Navy’s submarine force and is a major partner in the provision of support to the current surface fleet and to the future aircraft carrier programme. Flowmaster is used within Babcock Marine’s Design and Technology Mechanical Engineering Group, which offers front-end design, analysis and through-life support solutions.

Babcock Marine was contracted by the Ministry of Defence (MoD) to investigate and propose solutions to frequent component failures within the Sea Water fire mains systems onboard both the HMS Albion and HMS Bulwark vessels. To carry out the required number of system tests as fast and efficiently as possible, Babcock Marine utilised Flowmaster’s integration capabilities by linking the software with Microsoft® Excel to cleverly drive multiple ‘Real World’ testing line-ups and immediately extract results from the Flowmaster model, all via one ‘Front End’ Diagrammatical Spreadsheet.

Challenge

The MoD were experiencing multiple pump and pipe work failures within the Sea Water fire mains on both the HMS Albion and HMS Bulwark vessels.  These failures were attributed to various causes: 

  • Very high cost of maintenance on pumps
  • Frequent mechanical seal and motor bearing failures
  • Inability to meet system design requirements

Various small targeted initiatives to try and improve system performance were carried out, however it was recognised by Marine Auxiliary Systems Integrated Project Team (MXS IPT) that a more joined up systematic, system wide approach was required to address the route cause of the problems.

Solution

Babcock Marine’s Mechanical Engineering Group (MEG) were contracted through MXS IPT HESS (Holistic Engineering Support Strategy) Pumps, to model the entire HPSW (High Pressure Sea Water) system on both HMS Albion and HMS Bulwark to diagnose problems and recommend solutions. 

Design and Integration

Due to the size and complexity of the ship’s system (5 Fire, 2 Normal Demand and 2 Emergency  pumps connected into a ring main with numerous cooling demands and fire fighting spray systems) Babcock Marine decided to develop their own user interface constructed in Microsoft Excel to integrate with Flowmaster, enabling engineers to run simulations and view results through a single user interface.

Babcock Marine’s user interface was designed to mimic the look and behaviour of the onboard system management software. The activation of pumps and valves could be simulated through the spreadsheet by clicking on symbols. The valve and pump status were automatically updated in Flowmaster when the simulations were run. To improve efficiency, certain systems were grouped together so for example; all fire fighting sprays could be turned on in a certain zone through the click of one button, enabling the operator to model different operating scenarios.

The integration of Babcock Marine’s user interface enabled engineers to validate the system designs in Flowmaster quickly and easily. Aspects, such as the effects of the pump degradation and defective pressure control valves could be quickly ascertained and decisions to whether the system would perform under ideal conditions and actual "worn" conditions could be made with confidence.

To further add clarity to the results, pressure readings were automatically extracted from the Flowmaster model at the actual positions of the onboard remote pressure indication.  These readings were superimposed onto the model diagrammatic to give direct correlation with the readings visible on the onboard control programs.

Onboard Simulation and Validation

To measure the performance of the Flowmaster model, a true life level of demand needed to be established. Extensive onboard testing using ultrasonic flow measurement and various system line-ups were carried out to record the actual flow demands on the cooling systems.

Flowmaster together with Babcock Marine’s spreadsheet based user interface was used onboard to run ‘what if’ scenarios which were then replicated in the actual ‘Live’ system, with the predicted results compared to the actual system performance. These tests proved invaluable in building up an understanding of system performance requirements, the reasons behind the problems being experienced and ultimately enabled Babcock Marine to recommend design improvements that would reduce any further component failures.

This project clearly demonstrates Flowmaster’s ability to integrate with third party software, to enable engineers to simulate real onboard operating line-ups, utilising Flowmaster’s technical capability through one simple user-interface.

Top

News

Babcock Marine Integrates
Flowmaster to Reduce
Costs >

V7 Automotive &
V7 Aerospace
Hands-on Seminars >

V7 Aerospace Webcast
Watch Now >

Flowmaster & P+Z
Engineering Partnership >

V7 Automotive Webcast
Watch Now >

DATES FOR THE DIARY

Flowmaster UGM
May 2008 >

Flowmaster Training
Dates for 2008 >

We only specialise in one thing, now we do it even better!

© Flowmaster Group
Flowmaster Ltd, The Maltings, Pury Hill, Alderton Rd, Towcester, England, NN12 7TB